Planned Street Closures & Events

Print
Press Enter to show all options, press Tab go to next option

RDMSpecialEvents 

UPCOMING SPECIAL EVENTS CLOSURES

EVENT  Start Date  End Date  Road Closure
No Scheduled Events    

 

For an interactive web map containing future street closures, events and delays please click the below link:

Redmond Area Street Closures, Events and Delays Map

OverlayStreets 

Local Streets Scheduled for Maintenance Spring & Summer 2020

TYPE III SLURRY SEAL is used for high traffic areas. Slurry seals the existing pavement from water and creates a new wear surface. Slurry seal can also fill in some of the cracks and voids in  the asphalt. The streets scheduled for Type III slurry application are shown below.  A map of scheduled slurry sealing for 2020 can be found here.

Slurry20

 

ASPHALT OVERLAY  is a paving method of applying a new layer of asphalt to a deteriorating surface. Rather than tearing up an old asphalt surface entirely, an asphalt overlay project will use the existing layers as a base for the new asphalt pavement.  The streets scheduled for overlay maintenance are shown below. For a map of scheduled overlays for 2020, please click here.

Overlay

Questions? Please message us at streets@redmondoregon.gov or contact Public Works at (541) 504-2000.

 

 


 LOCATION
 LOCATION
SW 15th Street and SW Canyon Drive
SW 15th Street and SW Canyon Driv